The FY 2018-19 Annual Street Improvement Project involves the rehabilitation of existing roadways, including cold mill of existing asphalt concrete pavement, select removal of existing base course paving, and/or subgrade in select areas, full depth reclamation and cement stabilized pulverized base in select areas, construction of asphalt concrete pavement base course, and construction of asphalt rubber hot mix surface course paving along Main Street between Escondido Avenue and East of Topaz Road. The contract was awarded to Matich, All American Asphalt, and Sully-Miller, with base bid amounts of $1,359,850.00, $1,562,349.00, and $1,569,725.00, respectively. The project includes various items such as mobilization, bonds, insurance, erosion control, traffic control, surveying, and adjusting existing manhole covers and valve covers to grade.
• Rehabilitation of existing roadways
• Cold mill of existing asphalt concrete pavement
• Select removal of existing base course paving and/or subgrade
• Full depth reclamation and cement stabilized pulverized base
• Construction of asphalt concrete pavement base course
• Construction of asphalt rubber hot mix surface course paving
• Erosion control and pollution prevention
• Traffic control and safety
• Surveying
• Adjusting existing manhole covers and valve covers to grade