This contract is for the construction of new concrete sidewalks and pedestrian crosswalks along East Main Street in the City of Dothan, Alabama. The scope includes clearing and grubbing, removal of existing concrete median and curb‑and‑gutter, extensive excavation, mobilization, slope paving, installation of concrete sidewalks (4‑inch thick), a concrete driveway, detectable warning surfaces, curb ramps, various types of concrete curbs, topsoil, seeding, sod, mulching, temporary seeding/mulching, sandbags, silt‑fence installation and removal, geometric controls, and a full suite of temporary traffic‑control devices and signage. The project was competed through a public bid process, with the award ultimately granted to Wiregrass Construction Company, Inc. for a total bid amount of $591,549. The contract follows a unit‑price schedule (prices per square yard, linear foot, cubic yard, etc.) with a lump‑sum mobilization component.
• Primary civil‑engineering work: concrete sidewalk, curb, gutter, driveway, and associated earthwork.
• Supplemental site‑improvement items: topsoil, seeding, sod, mulching, sandbags, and erosion‑control measures.
• Temporary traffic‑control provisions: signs, cones, stripe markings, and portable arrow/chevron sign units.
• Awarded to a single general‑contracting firm (Wiregrass Construction) after full open competition.