Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alabama guideAlabama Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alabama
  4. ›Construction
  5. ›Construction of Concrete Sidewalks & Pedestrian Crosswalks…

Awarded contract·City of Dothan·Alabama

Construction of Concrete Sidewalks & Pedestrian Crosswalks Along East Main Street Tap Project TAPSU-TA23(924)

Won by Wiregrass Construction Company, Inc.$592kAwarded 10/23/2023Single Award
Contract source

Awarded vendors

  • Wiregrass Construction Company, Inc.

Description

This contract is for the construction of new concrete sidewalks and pedestrian crosswalks along East Main Street in the City of Dothan, Alabama. The scope includes clearing and grubbing, removal of existing concrete median and curb‑and‑gutter, extensive excavation, mobilization, slope paving, installation of concrete sidewalks (4‑inch thick), a concrete driveway, detectable warning surfaces, curb ramps, various types of concrete curbs, topsoil, seeding, sod, mulching, temporary seeding/mulching, sandbags, silt‑fence installation and removal, geometric controls, and a full suite of temporary traffic‑control devices and signage. The project was competed through a public bid process, with the award ultimately granted to Wiregrass Construction Company, Inc. for a total bid amount of $591,549. The contract follows a unit‑price schedule (prices per square yard, linear foot, cubic yard, etc.) with a lump‑sum mobilization component. • Primary civil‑engineering work: concrete sidewalk, curb, gutter, driveway, and associated earthwork. • Supplemental site‑improvement items: topsoil, seeding, sod, mulching, sandbags, and erosion‑control measures. • Temporary traffic‑control provisions: signs, cones, stripe markings, and portable arrow/chevron sign units. • Awarded to a single general‑contracting firm (Wiregrass Construction) after full open competition.

Attached files

Key dates

Bids closed
9/12/2023
Intent to award
10/23/2023
Awarded
10/23/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237990
Solicitation №
23-129

Contract value

$591,549

The certified bid tab shows Wiregrass Construction Company, Inc. with a total extension of $591,549.00. Because the award list includes only this vendor, the contract’s value is effectively that amount. No additional options, change orders, or escalation clauses are evident, so the contract value can be reasonably estimated at roughly $592 K.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Ontario·California

Top match · 73%

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Richmond·California

72% match

CARLSON CROSSTOWN PROJECT PHASE II PROJECT NO. 23033

Closes 11/11/2026Opened 10/15/2026

City of Sacramento·California

71% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Georgia City of College Park·Georgia

71% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

Municipality of Anchorage·Alaska

71% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Santa Cruz·California

71% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

Town of Westwood·Massachusetts

70% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Maryland State Highway Administration·Maryland

70% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Tyronza·Arkansas

70% match

Construction of Tyronza Hwy.118 Sidewalk Phase 1 (Main St.) (TAP‑24)(S)

Closes 11/10/2026Opened 10/18/2026

NYS East Fishkill, Town of·New York

70% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Fargo·North Dakota

70% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Culver City·California

70% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

City of Elk Grove·California

70% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

Ohio City of Westerville·Ohio

70% match

Brooksedge Area Mobility Improvements, PH 2 & 3

Closes 11/4/2026Opened 10/7/2026

Wisconsin Department of Transportation Bureau of Aeronautics·Wisconsin

70% match

Sidewalk Construction – Dane County Regional Airport (MSN1022 – Contract 2)

Closes 11/19/2026Opened 10/27/2026

City of Irving·Texas

69% match

Annual Concrete Contract - Repair of Sidewalk and Streets Using Allocated Funding From the Dart General Mobility Program.

Closes 11/6/2026Opened 10/20/2026

Maryland State Highway Administration·Maryland

69% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026

City of Vernon·California

69% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Charlotte·North Carolina

69% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

San Bernardino County·California

69% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

Maryland Baltimore City Department of Transportation·Maryland

69% match

TR-27003 RECONSTRUCTION OF FOOTWAYS CITY WIDE

Closes 11/18/2026Opened 10/24/2026

Connecticut Town of Voluntown·Connecticut

69% match

Shetucket Tpke & Beach Pond Sidewalk Construction

Closes 11/13/2026Opened 10/8/2026

City of Mobile·Alabama

69% match

Residential Sidewalk Repair Program

Closes 11/6/2026Opened 10/22/2026

Maryland Baltimore City Department of Transportation·Maryland

69% match

TR27002 Reconstruction of Footways Citywide

Closes 11/18/2026Opened 10/24/2026

City of Charlotte·North Carolina

69% match

Vision Zero Safe to School: WT Harris at Grier

Rolling / TBD closeOpened 4/1/2026