This contract is for drainage improvements in the Barrett Station Subdivision (Phase 2) for Harris County Precinct 3. The project involves regrading roadside ditches, upsizing culverts, and constructing a detention pond. The contract was awarded to Texas Materials Group, Inc. for $11,581,133. The project aims to reduce flood risk and strengthen resiliency in Harris County. Key aspects of the contract include:
• Drainage system improvements
• Detention pond construction
• Culvert upsizing
• Roadside ditch regrading
• Flood risk reduction
• Resiliency strengthening