Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Illinois
  4. ›Water and Wastewater
  5. ›2020-2021 Sanitary Sewer System Lining

Awarded contract·Four Rivers Sanitation Authority·Illinois

2020-2021 Sanitary Sewer System Lining

Won by Visu-Sewer of Illinois, LLC$2.4MSingle Award
Contract source

Awarded vendors

  • Visu-Sewer of Illinois, LLC

Description

The Rock River Water Reclamation District (RRWRD) commissioned a capital‑project to rehabilitate its municipal sanitary sewer collection system throughout Rockford, Loves Park, and Machesney Park using cured‑in‑place pipe (CIPP) lining. The work includes extensive sewer cleaning, television inspections, flow‑control, installation of CIPP liners (minimum 4.5 mm thickness, ≥ 4,500 psi flexural strength), reinforced pre‑liners in I/I sections, service reinstatement, protruding‑service removal with robotic cutters, and full surface restoration. The contract is structured as a unit‑price bid (linear‑foot rates for 8‑inch and 9‑inch pipe lining, reinforced pre‑liners, service reinstatement, etc.) with a lump‑sum traffic‑control item, includes a 10 % retainage, a $300 per day liquidated‑damage clause, and a two‑year unconditional warranty (potential 10‑year warranty if performance criteria are not met). The lowest responsive bidder, Visu‑Sewer of Illinois LLC, was awarded the contract. • Scope: CIPP lining of roughly 88,000 LF of 8‑inch pipe, 566 LF of 9‑inch pipe, plus associated service reinstatement and traffic control. • Schedule: All work must be completed and accepted by July 31 2021; main‑line repairs required by Oct 31 2020. • Key Requirements: Use pre‑qualified CIPP products, robotic removal of services > 1 in., 72‑hour notification for unknown live services, and compliance with Illinois prevailing‑wage, ADA, OSHA, and environmental statutes.

Attached files

Key dates

Bids closed
9/17/2020
Contract modified
9/11/2020
Ends
7/31/2021
Duration
12 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237120
Solicitation №
20-409

Contract value

$2,350,000

The bid tabulation shows the lowest responsive bid (Visu‑Sewer) at $2,344,129. The engineer’s baseline estimate is $2,857,674. Since the contract was awarded to the low bidder, the likely contract value is approximately $2.35 million. This estimate accounts for the unit‑price rates for pipe lining, reinforced pre‑liners, service reinstatement, and the lump‑sum traffic‑control item, and reflects the scale of work (≈ 88 K LF of 8‑inch pipe, 566 LF of 9‑inch pipe) plus ancillary services. No separate change‑order or option value is indicated.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Marysville, Ohio·Ohio

Top match · 71%

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of Ann Arbor·Michigan

71% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

Jefferson Parish Government·Louisiana

70% match

Bid Event #303 Two (2) Year Contract for Preventive Maintenance (Lining) of Existing Sanitary and Storm Sewers, Including Service Laterals at Various Locations for the Jefferson Parish department of Sewerage

Closes 1/5/2027Opened 10/28/2026

Louisiana Jefferson Parish·Louisiana

70% match

Two (2) Year Contract for Preventive Maintenance (Lining) of Existing

Closes 1/5/2027Opened 10/28/2026

City of North Olmsted·Ohio

69% match

Sanitary Sewer Rate Study

Closes 11/30/2026Opened 10/27/2026

Gary Sanitary District·Indiana

69% match

Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue

Closes 11/5/2026Opened 10/21/2026

City of West Des Moines·Iowa

69% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Delaware County Regional Sewer District·Ohio

69% match

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

City of Raytown·Missouri

69% match

2026 Sanitary Sewer Maintenance Project: White Oak West

Closes 11/18/2026Opened 10/22/2026

Gary Sanitary District·Indiana

68% match

REQUEST FOR QUOTES SANITARY SEWER REPAIR AT 1608 Broadway

Closes 11/19/2026Opened 10/29/2026

City of Ponca·Oklahoma

68% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

City of South San Francisco·California

67% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

City of Rapid City·South Dakota

67% match

2027 Sanitary Sewer Televising

Closes 11/10/2026Opened 10/24/2026

City of Braintree·Massachusetts

67% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

City of Rosenberg·Texas

66% match

Wastewater Treatment Plant Phase 2 - Collection System Rehabilitation

Closes 11/19/2026Opened 10/26/2026

Maryland Baltimore County Government·Maryland

66% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

City of Phoenix·Arizona

66% match

SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT

Closes 11/30/2026Opened 10/29/2026

Saline County·Kansas

66% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

City of Urbana·Illinois

66% match

Miscellaneous Sewer Repairs 2027, Section 26-00718-00-MS

Closes 11/12/2026Opened 10/29/2026

Georgia DeKalb County Government·Georgia

65% match

Annual Return Line Cleaning (Three (3) Year Multiyear Contract)

Closes 11/23/2026Opened 10/7/2026

Portage County·Ohio

65% match

2025 Sewer Maintenance Program (Franklin Hills P.S.)-Bid

Rolling / TBD closeOpened 4/22/2026

City of Lynchburg·Virginia

65% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

City of Lebanon·Indiana

65% match

Sanitary Ditch CSX Crossing - RE-BID

Closes 11/9/2026Opened 10/16/2026

City of Independence·Missouri

65% match

2024 Neighborhood Sanitary Sewer CIP Project No. 302004-2

Closes 11/4/2026Opened 10/7/2026

City of Findlay·Ohio

65% match

North Town Sanitary Sewer Replacement

Closes 11/12/2026Opened 10/28/2026