This contract covers the design‑build of roadway and sanitary‑sewer improvements at the intersection of North Avenue and Napoleon Street in Rockford, Illinois (Capital Project # 2564). The scope includes removal and replacement of existing asphalt and concrete pavement, installation of new 4‑in. and 8‑in. PVC sanitary sewer pipe, construction of four new manholes, new curb‑and‑gutter, sidewalk work, utility adjustments, and site restoration (topsoil, seeding, mulching). The work must be coordinated with the City of Rockford for right‑of‑way permits, traffic control, and utility location, and must comply with FRSA, IDOT, and IEPA standards. The contract is a unit‑price award valued at roughly $689 K, with a tight schedule that requires completion by mid‑November 2025.
• Roadway demolition, base course, hot‑mix asphalt binder and surface courses, concrete driveway and sidewalk installation.
• Sanitary sewer installation (654 ft 8‑in. PVC, 807 ft 4‑in. service) and four new manholes.
• Utility coordination, traffic‑control planning, and erosion‑control/landscape restoration.