Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Waste Removal and Collection
  5. ›Flow Meters Parts, Repairs

Awarded contract·Pinellas County·Florida

Flow Meters Parts, Repairs

Won by Universal Controls Instrument Services,$9.7MSingle Award
Contract source

Awarded vendors

  • Universal Controls Instrument Services,

Description

This contract is for the provision of flow meters parts and repairs services to Pinellas County. The contract has a term of 60 months and a total value of $9,731,881.76. The contractor is required to provide all necessary personnel, equipment, and materials to perform the services. The contract includes provisions for payment, invoicing, and dispute resolution. The county has the right to terminate the contract for cause or convenience, and the contractor is required to indemnify the county against any claims or damages arising from the contract.

Attached files

Key dates

Starts
8/10/2021
Ends
8/9/2026
Duration
60 months

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Utilities and Waste Management
NAICS
221310
Solicitation №
190-0445-B

Contract value

$9,731,882

The contract value is explicitly stated as $9,731,881.76. This value is based on the total cost of the services provided by the contractor over the 60-month term of the contract.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Arlington County Government·Virginia

Top match · 75%

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Charlotte·North Carolina

73% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Phoenix·Arizona

72% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

Michigan

72% match

938-17-16 - Verification, Preventative Maintenance, and Repair Services - Flow Meters

Closes 11/2/2026Opened 10/12/2026

The Metropolitan District·Connecticut

69% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

Connecticut Metropolitan District Commission·Connecticut

69% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

NYS Rockland County·New York

68% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

68% match

FLUXMETER

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

67% match

48--VALVE,FLOW CONTROL, IN REPAIR/MODIFICATION OF

Closes 12/15/2026Opened 9/16/2026

Atlantic County Utilities Authority, NJ·New Jersey

67% match

Atlantic City Flow Meter Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Bedford, TX·Texas

67% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

National Aeronautics And Space Administration·Mississippi

66% match

Repair and replacement of existing MTS lab Equipment

Closes 8/26/2027Opened 8/24/2026

The Ohio State University·Ohio

66% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

Massachusetts Town of Kingston·Massachusetts

66% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

65% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

The Metropolitan Water District of Southern California·California

65% match

Furnish one hundred sixty (160) Chemical Flow Meters for the Metropolitan Water District Skinner Plant

Closes 12/7/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

64% match

66--INERTIAL MEASURING, IN REPAIR/MODIFICATION OF

Closes 12/6/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

64% match

66--INERTIAL MEASURING, IN REPAIR/MODIFICATION OF

Closes 11/6/2026Opened 10/7/2026

Georgia City of Oxford·Georgia

64% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

64% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/2/2026Opened 10/2/2026

City of Boca Raton·Florida

64% match

Installation and/or Replacement of Potable and, or Reclaimed Water Meters with AMI Transponders

Closes 11/23/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

64% match

48--VALVE,FLOW CONTROL, IN REPAIR/MODIFICATION OF

Closes 11/17/2026Opened 8/19/2026

U.S. Department Of Defense·Pennsylvania

63% match

16--TURBINE,COOLING, IN REPAIR/MODIFICATION OF

Closes 11/18/2026Opened 8/20/2026

U.S. Department Of Defense·Oklahoma

63% match

Repair of E-3 Temperature Indicator

Closes 11/29/2026Opened 10/30/2026