The contract is for the repair of a high voltage line at the Fishcreek WWTP #25. The contract was awarded to two vendors, Speelman Electric, Inc. and Thompson Electric Inc., with prices of $113,350.00 and $116,403.95, respectively. The contract completion is 120 days after Notice To Proceed. The scope of work includes the replacement of the line between transformers T2 and T6.
• The contract is a lump sum contract
• The contract completion is 120 days after Notice To Proceed
• The scope of work includes the replacement of the line between transformers T2 and T6
• The contract was awarded based on the lowest and most responsive and responsible bid