The contract is for the transmission pole stabilization project, which includes the construction of gabion walls, riprap, grading, and all appurtenant work to support pole number 48 of the A-K transmission line. The project was bid on by several vendors, with the lowest responsive bid being $58,090.00. The contract was awarded to the City of Independence (MO) and the project is expected to be completed within a certain timeframe, although the exact duration is not specified. Key aspects of the project include the construction of gabion walls, riprap, and embankment, as well as the payment performance maintenance bond.
• The project involves the construction of gabion walls, riprap, and embankment.
• The project requires a payment performance maintenance bond.
• The contract was awarded to the City of Independence (MO).
• The project is expected to be completed within a certain timeframe.
• The lowest responsive bid was $58,090.00.