The contract is for the replacement of the roof at Endeavor Academy at Central High School. The project includes the removal of the existing 2-ply modified roofing and the installation of a new single-ply fully-adhered membrane. The contract was awarded to Advanced Roofing, Inc. for $527,700.00. The scope of work includes cutting existing concrete parapet walls, providing new wood blocking, and applying new paint coatings.
• The project requires the removal of the existing roofing material
• The installation of a new single-ply fully-adhered membrane
• Cutting existing concrete parapet walls to provide new primary scupper openings
• Providing new wood blocking at parapet walls, deck curbs, and at eave/rake edges
• Applying new paint coatings at scupper repair areas