The contract is for the Highlands (ARD 4/5) Sewer Relief Project, which includes the demolition of existing pump stations and the construction of new facilities. The project has an estimated construction cost of $7,318,000 and a duration of 385 calendar days. The contract was awarded to W. M. Lyles Co. with a bid of $4,619,300.00. The project involves the construction of new wet wells, valve vaults, manholes, piping, electrical equipment, and instrumentation control systems.
• The project is located in North Highlands, Sacramento County, CA
• The contract includes the furnishing of all labor, materials, tools, and equipment
• The contract has a mandatory pre-bid conference and a site visit
• The contract requires a contractor license with a CLASS A - GENERAL ENGINEERING classification