The contract is for channel erosion repairs along P130-02-00 from South of Woodland Hills Drive to Rankin Road for the Harris County Flood Control District. The project involves tree removal, backslope swale system repair and installation, desilting of the existing channel, and repair of side slopes and sinkholes. The contract was awarded to Solid Bridge Construction for a total amount of $947,724. The project is a partnership between Harris County and the Trail of the Lakes MUD, with a cost share split of 50/50.
• The project is located in northeast Harris County, north of Beltway 8, along P130-02-00.
• The scope of work involves tree removal, backslope swale system repair and installation, desilting of the existing channel, and repair of side slopes and sinkholes.
• The project is expected to repair channel erosion and restore the side slopes of P130-02-00.
• The contract was awarded based on a low bid process, with Solid Bridge Construction being the low bidder.
• The project is scheduled to start on August 29, 2023, and is expected to be completed by August 28, 2024.