The contract is for the construction of a new Biological Nutrient Reduction System to replace the existing Rotating Biological Contactor system. The scope of work includes the construction of a new operations building, equipment for the BNR system, and site grading and improvements. The estimated cost of the project is $17,600,000.00. The contract was awarded to The Great Lakes Construction Co. The key aspects of the contract include the construction of a new BNR system, the conversion of existing primary clarifiers and chemical clarifiers to equalization basins, and the removal of the existing RBC equipment.
• The contract includes the construction of a new operations building with chemical feed systems, aeration blowers, electrical room, and control room.
• The scope of work includes site grading, site improvements, paving, and yard piping.
• The contract also includes electrical, instrumentation, heating, and plumbing work.
• The estimated cost of the project is $17,600,000.00.
• The contract was awarded to The Great Lakes Construction Co.