This contract concerns the stabilization of a 4,200‑foot riverbank at Daroga Park, encompassing extensive environmental and civil works such as erosion control, utility relocation, sediment containment, riparian restoration, and installation of temporary structures. The Chelan Public Utility District funded the project with an estimated budget of $2.8 million, ultimately awarding the contract to Strider Construction Co., Inc. for $1,727,500. The work includes geotextile placement, boulder and rock installation, concrete steps, handrails, benches, and extensive site cleanup.
• Scope: bank stabilization, erosion and sediment control, utility repairs, riparian restoration, temporary construction facilities.
• Award: Strider Construction Co., Inc. – $1,727,500 (lowest bid).
• Agency: Chelan Public Utility District, Washington State, contact Tammy Harn (phone (509) 661‑4479, email
[email protected]).