This municipal contract involves the replacement and repair of approximately 43,000 sq ft of roofing across multiple city facilities using a KEE roofing system applied both adhesively and mechanically. The work is executed on a lump‑sum basis, with a 5 % bid bond requirement and state sales tax applied to the bid amounts. Leslie & Campbell Inc. was awarded the contract with a pre‑tax bid of $350,000, resulting in a total contract price of $378,700 after tax. The procurement was conducted through full and open competition, with bids opened on March 24 2020 and the award finalized on March 20 2020.
• Scope: Roof repair/re‑roofing for four phases covering ~43,000 sq ft, using KEE roofing system.
• Budget: Awarded bid $350,000 (≈ $378,700 total with tax).
• Procurement: Open competition; award to Leslie & Campbell Inc.; 5 % bid bond required.
• Timeline: Bids opened 24 Mar 2020; award made 20 Mar 2020; contract start presumed shortly thereafter.