The contract is for the removal of existing industrial storage shelving and construction of walls, doors with access control system, surveillance camera system, glazing, flooring, and architectural finishes at the CBJ Ballot Processing Center. The contract was awarded to Carver Construction for $231,192.63. The project includes electrical work, such as installation of new light fixtures, building power surge protection, fire alarm devices, receptacles, and data outlets. The architect's estimate for the project was $215,000.00.
• The contract includes the removal of existing industrial storage shelving and construction of new walls, doors, and flooring.
• The project includes electrical work, such as installation of new light fixtures and building power surge protection.
• The contract was awarded to Carver Construction for $231,192.63.
• The architect's estimate for the project was $215,000.00.
• The project includes a pre-bid conference and site visit.
• The contract includes a protest period, during which bidders can submit protests in accordance with the CBJ Purchasing Code.