This contract awards a $4.81 million fixed‑price job to rehabilitate the 20th Street Bridge in Denver. The scope includes removal of existing bridge components, concrete deck repair, installation of a thin bonded polyester concrete overlay, replacement of bridge railings, expansion joint replacement, and spot/zone painting of steel girders. The project also requires extensive site preparation, erosion control, environmental protection (wildlife biologist, bird protection, nest removal), and utility work such as dewatering and temporary diversions. An MWBE participation goal of 12 % is stipulated, and the contract is subject to Denver prevailing‑wage and minimum‑wage requirements. The work is to be performed under a 240‑day schedule once the award is executed.
• Major bridge rehabilitation (demolition, concrete work, steel repair, overlay)
• Environmental mitigation and traffic‑control measures
• Fixed‑price contract with a $4.81 M award and a 12 % MWBE goal.