This contract is for the non-complex design build road relocation with stream bank stabilization on Akron Peninsula Road. The project includes the relocation of approximately 1,500 feet of road, removal of concrete debris, and stabilization of the river bank. The engineer's estimate for the project is $978,451.40. The contract was awarded to two vendors, Grassbaugh LLC and Kenmore Construction Co., Inc., with total prices of $989,427.39 and $717,574.00, respectively. The key aspects of this contract include:
• Road relocation and stream bank stabilization
• Removal of concrete debris
• Stabilization of the river bank
• Engineer's estimate of $978,451.40
• Awarded to two vendors, Grassbaugh LLC and Kenmore Construction Co., Inc.
• Total prices of $989,427.39 and $717,574.00, respectively