The County of Calaveras is seeking bids for the Rock Creek Final Cover Phase I Slide Repair project. The project involves repairing the final cover in the damage area, installing geogrid in the repair area, tie-in new final cover to existing final cover, regrading bench to drain to channel and downdrain, installing downdrain and anchors, installing grouted rock slope protection in the channel and downdrain inlet, and seeding the repaired area. The contract is expected to be awarded to Ford Construction Company, Inc. The project is located at 12021 Hunt Road, Farmington, CA 95230.
• The project involves repairing the final cover in the damage area
• The project involves installing geogrid in the repair area
• The project involves tie-in new final cover to existing final cover
• The project involves regrading bench to drain to channel and downdrain
• The project involves installing downdrain and anchors
• The project involves installing grouted rock slope protection in the channel and downdrain inlet
• The project involves seeding the repaired area