The Litchfield 8-Bay Garage Replacement project involves the construction of a new 8,800 square foot pre-engineered building with eight vehicle storage garage bays, as well as all site work, paving, lighting, and other necessary utilities. The project includes the removal of the existing 8-bay concrete floor slab and foundation, and the relocation of propane tanks and utility connections. The contract was awarded to The Sheridan Corporation, and the project is expected to be completed within 210 days of starting work on site, with a substantial completion date of September 6, 2023, and a final completion date of October 13, 2023. The project will be governed by the Maine Department of Transportation Standard Specifications, Revision of March 2014, and the Maine Turnpike Supplemental Specifications.
Some key features of the project include:
• Construction of a new 8,800 square foot pre-engineered building with eight vehicle storage garage bays
• Removal of the existing 8-bay concrete floor slab and foundation
• Relocation of propane tanks and utility connections
• Installation of new exterior H-20 load rated oil/water separator
• Installation of new generator pad and exterior generator
• Establishment of underground power service to the New Vehicle Storage Garage
• Removal and disposal of existing generator building, including generator, and previous above ground fuel tank slab
• Installation of new 4 inch PVC vent and electrical conduit from existing 6,000 gallon water holding tank to north west corner of existing mechanics garage
• Construction of an earthen berm at the northwest corner of the project