This contract is a Construction Management/General Contractor (CM/GC) award issued by the City and County of Denver’s Department of Transportation and Infrastructure for the replacement of Sanitary Lift Station #5 located at 5125 N. Franklin St., Denver. The scope includes bypass pumping, demolition of existing structures, excavation of a new wet well, groundwater de‑watering/remediation, construction of new lift‑station facilities, and installation of mechanical, electrical, instrumentation, and control systems, with off‑site material lay‑down due to site constraints. The award was granted to HENSEL PHELPS CONSTRUCTION CO. after a competitive procurement process that required pre‑qualification in Category 1E(1) or Category 2A (≥ $18 M) and a 10 % MWBE participation goal. All proposals had to be submitted electronically via BidNet by July 31, 2025, and the contract was officially awarded on September 2, 2025.
• CM/GC services for a critical wastewater infrastructure upgrade – demolition, excavation, new wet‑well, and full mechanical/electrical fit‑out.
• Mandatory MWBE participation (10 % construction phase) and compliance with Denver’s Workforce Ordinance and prevailing‑wage requirements.
• Single‑vendor award to HENSEL PHELPS CONSTRUCTION CO.; pre‑qualification required via B2Gnow and registration on BidNet.