Awarded vendors
- Fire Protection Specialists LLC
Description
The contract is for the replacement of the Jackson Powerhouse fire detection and suppression system. The project includes the demolition of the existing CO2 fire suppression systems, installation of a very early smoke detection apparatus (VESDA) air sampling smoke detection system, and installation of a Victaulic Vortex hybrid fire suppression system. The project is located at the District's Jackson Hydroelectric Project Powerhouse in Sultan, Washington. The engineer's estimate for the project is $440,000.00. The contract was awarded to Fire Protection Specialists LLC, with a bid price of $419,456.00.
• The contract includes the replacement of the existing smoke detection system with a new vendor-designed fire detection network.
• The project will be phased to allow the Powerhouse to remain in operation throughout the execution of the work.
• A pre-bid meeting was held on August 12, 2020, with a site visit at the Jackson Powerhouse.
• The contract documents include a proposal form, specifications, and exhibits.
• The contract is subject to change and is estimated to be awarded on September 1, 2020.