This contract involves the comprehensive repair, maintenance, and restoration of Wayne State University’s Parking Structure 6, a multi‑level garage located on the Detroit campus. The scope includes concrete structural repairs (partial‑depth, full‑depth, slab‑on‑grade), reinforcement replacement, shoring and bracing, utility protection, sealant and joint work, traffic‑coating application (≈210,000 SF new system), painting, pavement‑marking restoration, fire‑suppression standpipe repairs, and associated demolition and site‑phasing activities. All work must comply with Michigan state codes, WSU prevailing‑wage schedules, and strict safety, environmental, and phasing constraints (no more than 200 parking spaces closed at any one time, 10‑day notice for space closures, 72‑hour utility notice, and a summer‑only work window ending 15 Aug 2025 with continuation into Summer 2026). The contract is a lump‑sum “General Contract” with a 5‑year warranty on major systems and requires extensive documentation (shop drawings, testing reports, certification of wages, and final as‑built packages).