Awarded vendors
- Millhouse Renovations, LLC
Description
This contract is for minor home repairs at 4608 Westmont Blvd. in Copley, Ohio. The repairs include replacing the front porch metal handrail, utility sink faucet, and other fixtures. The contract also includes installing new rangehood, grab bars, and other items. The total cost of the contract is $15,535.00. The contractor must complete the work within 30 days of signing the contract and must follow COVID-19 protocols. The key aspects of this contract include:
• Replacement of front porch metal handrail
• Replacement of utility sink faucet
• Installation of new rangehood
• Installation of grab bars
• Replacement of drain assembly and drain pipes
• Installation of new drywall
• Replacement of front entry door and screen door
• Cleaning of gutters