This City of Wilmington contract calls for the selective demolition of the deteriorated pier serving the Best Western Plus Coastline Inn and the adjacent Riverwalk, followed by site restoration and a new concrete pad. The work includes utility shutdown, removal of timber and steel structural elements, disposal of all debris (including hazardous materials), erosion‑control measures, and post‑demolition grading, seeding, and site cleanup. The contract is a fixed‑price, open‑competition solicitation with a 90‑day performance window and liquidated damages of $250 per day for overruns. Key requirements include a 14 % MWBE subcontracting goal, extensive safety and environmental controls, insurance and bonding, and a one‑year warranty on workmanship.
• Demolition of pier timber, steel, pile caps, and associated concrete; jet‑cutting of piles to at least 2 ft below mudline.
• Utility coordination, hazardous‑material handling, EPA‑approved waste disposal, and installation of turbidity curtains/erosion controls.
• Site restoration: back‑fill, new concrete pad, grading, temporary grass/straw, and final site cleanup with a one‑year guarantee.