Stearns Conrad and Schmidt, Consulting Engineers, Inc. d.b.a SCS Field Services
ETIC
Tetra Tech BAS, Inc.
Blue Flame Crew West, LLC
Teichert Energy & Utilities Group, Inc.
Description
The contract is for the Kiefer Landfill 2019 Gas System Improvements project, which includes the decommissioning of eleven vertical wells, construction of 18 new vertical extraction wells, and approximately 11,300 linear feet of collection piping. The estimated construction cost is $1,120,000. The contract was awarded to multiple vendors, with Sierra National Construction, Inc. being the apparent low bidder. The project requires a General Engineering Contractor, Class A license.
• The project involves gas system improvements at the Kiefer Landfill.
• The contract includes decommissioning of vertical wells and construction of new extraction wells.
• The project requires approximately 11,300 linear feet of collection piping.
• The estimated construction cost is $1,120,000.
• The contract was awarded to multiple vendors.
• The project requires a General Engineering Contractor, Class A license.