This contract awards the rehabilitation of Madden Bridge #58 in Snohomish County, WA. The work includes demolition of existing bridge portions, concrete overlay, steel railings, deck preparation, paving, erosion‑control, traffic‑control devices, and related site cleanup. The bid was awarded through full open competition to Combined Construction, Inc., a local contractor with extensive bridge‑rehab experience. The project is funded with federal highway aid and county funds, and includes a 15 % DBE participation goal. The award reflects a unit‑price schedule, requiring a 5 % bid bond and performance/payment bonds equal to the contract price.
• Scope: Bridge demolition, concrete work, steel railing, paving, erosion and water‑pollution control, traffic‑control signage, and final cleanup.
• Funding: Federal‑aid (FA BHS‑K311 (001)) plus Snohomish County funds; Engineer’s estimate ≈ $705,525.
• Requirements: DBE goal 15 %, 5 % bid bond, performance & payment bonds, compliance with wage, EEO, and safety statutes.