This contract calls for the complete removal and replacement of the fence surrounding the Worcester Dual‑Language Magnet School playground. The scope includes demolition of existing chain‑link fencing, removal of concrete footings and debris, site grading, and installation of new chain‑link fence (8‑ft and 4‑ft sections) with steel posts, rails, and gates, plus temporary protective fencing during construction. The work must be finished by 21 December 2025, comply with prevailing‑wage requirements, MWBE participation goals, and a suite of city‑mandated certifications (wage‑theft, CORI, gender‑identity, etc.). Bids were sealed, with a 5 % bid security required, and the contract will be awarded to the lowest responsive bidder, New Generation Landscaping & Fence, Inc.
• Remove ~649 LF of existing fence and concrete footings; haul debris.
• Install new 8‑ft (433 LF) and 4‑ft (216 LF) chain‑link fence, plus one double‑drive gate and two pedestrian gates.
• Provide temporary 6‑ft fence, adhere to noise/working‑hour restrictions, and submit weekly certified payroll.