The contract is for the replumbing of Fire Station No. 3, which includes replacing all existing piping, valves, fixtures, and water heater. The bid was awarded to Environmental Systems, Inc., with a total bid of $58,035.00. The project requires the replacement of all existing piping and assorted valves, fixtures, and water heater. The scope of work includes repiping the fire station, and the contractor must meet the specifications and requirements outlined in the bid documents.
• The project involves replacing all existing piping, valves, fixtures, and water heater.
• The bid was awarded to Environmental Systems, Inc., with a total bid of $58,035.00.
• The project requires the contractor to meet the specifications and requirements outlined in the bid documents.
• The scope of work includes repiping the fire station.
• The contractor must attend a pre-bid conference to be eligible to bid.