This solicitation seeks a qualified engineering firm to provide full structural design and construction‑management services for the replacement of the deck on the Hatch Bridge (Bridge No. 3407) over Latah Creek. The work includes demolition of the existing metal deck, design of a new concrete deck system, replacement of bridge railing, and on‑site construction‑phase support such as submittal reviews, RFIs, and inspections. The contract is a one‑year award with optional renewals and is funded with federal assistance.
• Scope covers detailed structural engineering, deck demolition and replacement, and construction‑management consulting.
• Required deliverables include design drawings, specifications, construction‑phase review, and final documentation.
• The project is located in Spokane, WA and is managed by the City’s Purchasing Department in coordination with the Engineering Services Department.