The 2025 Landfill Gas Collection System Expansion project involves the installation of vertical gas collection and soil vapor extraction wells, associated wellheads, headers and laterals, piping connections, valving, and pipe supports. The project is located at the Neal Road Recycling and Waste Facility in Butte County, California. The engineer's estimate for the project is $230,630. The contract was awarded to Tetra Tech and Ford Construction, with bid amounts of $259,998 and $243,635, respectively. The project requires the contractor to furnish all labor, tools, materials, equipment, and incidentals necessary to complete the project as shown on the plans, as described in the Special Provisions, or as directed by the Engineer. Some key features of the project include:
• Installation of vertical gas collection and soil vapor extraction wells
• Associated wellheads, headers and laterals, piping connections, valving, and pipe supports
• Conformance with the California Department of Transportation 2018 Standard Specifications
• Furnishing all labor, tools, materials, equipment, and incidentals necessary to complete the project
• Mandatory pre-bid meeting
• Vendor attendance is required at the pre-bid meeting