The City of Palm Bay has awarded a contract for the replacement of lot line culverts in the Palm Bay Colony area. The project involves the removal and installation of new culverts, as well as the removal and reinstallation of existing items such as sidewalks, fencing, and headwalls. The contract was awarded to two vendors, Ag-Scape Services dba Florida Site Contracting and Stillwater Construction, Inc. The project is estimated to cost between $35,000 and $45,000.
• The project involves the replacement of two lot line culverts with new 18" culverts.
• The project requires the removal and reinstallation of existing items such as sidewalks, fencing, and headwalls.
• The contract was awarded to two vendors, Ag-Scape Services dba Florida Site Contracting and Stillwater Construction, Inc.
• The project is estimated to cost between $35,000 and $45,000.
• The project requires erosion control measures to be taken during construction.
• The project involves utility coordination and the removal and disposal of existing materials and structures.