Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›R-7307 Alamitos Bay Berth 1 And 2 Dock Replacement

City of Long Beach·California

R-7307 Alamitos Bay Berth 1 And 2 Dock Replacement

Closes 11/19/2026$150k – $300kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Long Beach is seeking a qualified contractor to replace the existing timber floating docks at Alamitos Bay berths 1 and 2 with a new concrete floating dock, aluminum gangway, and associated utility upgrades. The scope includes complete demolition, disposal of existing structures, installation of a 250‑ft concrete dock, an 80‑ft ADA‑compliant aluminum gangway, new potable‑water, fire‑water, sewage pump‑out, electrical distribution, LED lighting, EV chargers, and site improvements such as guardrails, sidewalks, curb ramps, signage, and trash receptacles. The contract is subject to the Citywide Project Labor Agreement, prevailing‑wage requirements, and extensive environmental best‑management‑practice controls. The work must be completed within a 280‑day construction period, with liquidated damages of $2,500 per day for overruns. • Demolition and removal of existing timber docks, gangways, hinges, and utilities. • Installation of a concrete floating dock, aluminum gangway, new utility systems (water, fire, sewer, electrical, lighting, EV charging). • Site‑improvement works: guardrails, ADA‑compliant curb ramps, sidewalks, signage, trash receptacles, and related BMPs. • Must comply with PLA, prevailing‑wage, DBE/Minority‑owned requirements, and obtain all required permits (USACE, CCC, RWQCB).

Attached files

Contact

Hugo Liu(Project Manager)

[email protected]

(562) 570-5578

Key dates

Opened
10/8/2026
Questions due
10/27/2026
Pre-bid meeting
10/14/2026
Site visit
10/14/2026
Closes
11/19/2026
Duration
280 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
PW-27-799

Budget estimate

$150,000 – $300,000

The engineer’s estimate places the project at roughly $3 million. Assuming a typical contractor profit margin of 5‑10 % and accounting for the high‑cost nature of marine concrete and utility work, the expected net earnings for the winning contractor would likely fall between $150,000 and $300,000. Factors influencing this range include the actual final bid price, scope changes, subcontractor costs, and any cost‑plus reimbursements for unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Watsonville·California

Top match · 86%

Pinto Lake Dock Replacement Project

Closes 11/10/2026Opened 10/2/2026

City of Long Beach·California

86% match

Jib Crane Replacement

Closes 11/19/2026Opened 9/23/2026

Port of Long Beach·California

86% match

HD-S3180 Pier B On-Dock Rail Support Facility North Yard Utilities & Pier B St. Widening

Closes 11/17/2026Opened 9/17/2026

U.S. Department Of The Interior·Colorado

86% match

LARO 258755 - Replace Dilapidated Docks and Fuel S

Closes 11/10/2026Opened 9/11/2026

Port of Long Beach·California

86% match

HD-S3215 Pier B On-Dock Rail Support Facility Rail Yard Access Improvements

Closes 12/15/2026Opened 10/29/2026

City of Long Beach·California

86% match

R-7298 1st Street Pedestrian Improvements

Closes 11/10/2026Opened 10/7/2026

City of Key West·Florida

84% match

A-Dock Replacement and D-Dock Decking Replacement Key West Bight Marina

Closes 11/23/2026Opened 10/15/2026

City of Melbourne·Florida

84% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

City of Long Beach·California

82% match

R-7292 Marine Stadium Electrical Infrastructure

Closes 11/18/2026Opened 10/14/2026

Port of San Diego·California

82% match

HARBOR POLICE HEADQUARTERS FACILITY IMPROVEMENTS

Closes 12/9/2026Opened 10/21/2026

City and County of San Francisco·California

82% match

EXT REC | CON26-0014 Marina Seawall - MLBE

Closes 12/31/2027Opened 1/16/2026

Port of San Diego·California

81% match

STRUCTURAL REPAIRS AT NCMT BERTHS 24-3 AND 24-4, NATIONAL CITY

Closes 11/4/2026Opened 9/22/2026

County of Stanislaus·California

81% match

Turlock Lake State Recreation Dock Replacement

Closes 11/12/2026Opened 10/21/2026

City of Long Beach·California

81% match

R-7259 Palo Verde Avenue Pedestrian Bridge Sign Project 3003210017

Closes 11/10/2026Opened 9/30/2026

City of Newport News·Virginia

81% match

Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/9/2026Opened 10/8/2026

City of Laguna Beach·California

81% match

Old Top of the World Lift Station Rehabilitation - Phase II

Closes 11/10/2026Opened 10/9/2026

Maryland Baltimore City Recreation and Parks·Maryland

81% match

RP23888 Latrobe Park Longhouse Restoration

Closes 12/2/2026Opened 10/29/2026

New York City Department of Parks & Recreation·New York

81% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

New York City Department of Parks and Recreation·New York

81% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/19/2026Opened 10/16/2026

Port of Long Beach·California

80% match

HD-S3203 HARBOR FLEET ZERO EMISSIONS INFRASTRUCTURE

Closes 11/17/2026Opened 10/8/2026

Jacksonville Port Authority·Florida

80% match

TALLEYRAND MARINE TERMINAL (TMT) PILE, CAP, AND BEAM REHAB

Closes 11/3/2026Opened 10/1/2026

City of Fort Myers·Florida

80% match

Derelict Vessel Removal Service Continuing Contract (Disaster)

Closes 11/10/2026Opened 7/16/2026

City of Clermont·Florida

80% match

Meet Us in the Middle Park and Docking Facility Construction

Closes 11/5/2026Opened 8/3/2026

City of Newport News·Virginia

80% match

IFB# 27-2089-6256, Seafood Industrial Park Outer Harbor Pier & Dolphins Restoration

Closes 11/2/2026Opened 10/8/2026