The contract is for the replacement of a septic system at 5326 Donner Dr. New Franklin, Ohio 44216. The project involves the installation of an NPDES compliant aerobic treatment system capable of treating 360 gallons per day, with a pump fail safe, meeting all aspects of state sewage treatment system rules. The contractor is responsible for locating all water wells and ensuring that the existing septic is pumped, crushed, and filled according to state and local code. The contract was awarded to Summit Excavating, Inc. with a total of $10,499.00.
• The project requires the installation of an NPDES compliant aerobic treatment system
• The contractor is responsible for locating all water wells
• The existing septic must be pumped, crushed, and filled according to state and local code
• The contract was awarded to Summit Excavating, Inc. with a total of $10,499.00
• The project is subject to Davis Bacon wage rates
• The contractor must follow COVID protocols on the job site at all times