The South Street Sewer Extension project involves the installation of an 8" sanitary sewer main to address non-conforming sewer services along South Street. The project also includes the replacement of an existing 4" water main with an 8" PVC main and the reconstruction of the street section on 7th Street from South Street to Columbus. The contract was awarded to Elite Enterprises and Underground Construction, with base bids of $740,041.03 and $597,078.10, respectively. The engineer's estimate for the project was $600,000.00.
• The project includes the installation of a new sewer main and the replacement of an existing water main.
• The street section on 7th Street from South Street to Columbus will be reconstructed.
• The contract was awarded to two vendors, Elite Enterprises and Underground Construction.
• The base bids for the contract were $740,041.03 and $597,078.10, respectively.
• The engineer's estimate for the project was $600,000.00.