This contract awards electrical‑upgrade services at the CAL FIRE Pilot Rock Fire Center in Hesperia, California. The work includes installing a new concrete equipment pad, replacing and adding high‑voltage panels, transformers, conduit, and associated wiring, as well as removing existing power poles and performing testing, cleanup, and warranty documentation. The project is a public‑works, sealed‑bid solicitation with a firm‑fixed‑price award of $105,160 to a qualified electrical contractor.
• Scope covers concrete pad construction, 277/480 V and 120/208 V panel installation, transformer placement, conduit upgrades, and pole removal.
• Contract period runs from 30 June 2026 to 29 June 2028 with a possible one‑year extension.
• Requires C‑10 electrical contractor license, DIR registration, prevailing‑wage compliance, and assorted certifications (SB, DVBE, Darfur, sanctions, etc.).