The contract is for the installation of a complete underground sprinkler, emitter, and bubbler system for all turf and landscaped areas at the FSU Oglesby Union Green Roof. The contractor is responsible for providing all labor, equipment, appliances, and materials, including water, and for performing all operations in connection with the construction of the irrigation system. The contract was awarded to Conrad Design & Landscape, Inc. Key aspects of the contract include the installation of plastic and copper pipe and fittings, automatic control valves, valve access boxes, electric computerized central controllers, and electric wire. The contractor is also responsible for all costs of water used in connection with the installation of the irrigation system.
• The contract is for a green roof system at the FSU Oglesby Union.
• The contractor must provide all labor, equipment, and materials.
• The system includes underground sprinkler, emitter, and bubbler systems.
• The contractor is responsible for all costs of water used during installation and maintenance.
• The contract was awarded to Conrad Design & Landscape, Inc.