Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Jersey guideNew Jersey Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Jersey
  4. ›Construction
  5. ›Contract No. T200.608 Roadway Stabilization and…

Awarded contract·New Jersey Turnpike Authority (NJTA)·New Jersey

Contract No. T200.608 Roadway Stabilization and Reprofiling Improvements Milepost 97 to 98 and 102 to 104.5

$3.5MSingle Award
Contract source

Description

This contract (T200.608) calls for roadway stabilization and reprofiling improvements along two segments of a state‑maintained route in New Jersey: Milepost 97‑98 and Milepost 102‑104.5, totaling approximately 3.5 miles. The work is expected to include removal of deteriorated pavement, sub‑grade repair, drainage enhancements, and resurfacing to restore safe, durable travel conditions. The project is likely to be executed under a construction‑type procurement and will be managed by the New Jersey Transit Authority, which oversees transportation infrastructure across the state. • Scope: pavement removal, sub‑grade stabilization, drainage upgrades, and resurfacing over ~3.5 miles. • Location: New Jersey, specific milepost segments of a state highway. • Procurement: posted on a public letting portal (bidx.com) indicating an open competition for qualified contractors.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
10/24/2023

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
Contract No. T200.608

Contract value

$3,500,000

The contract covers about 3.5 miles of roadway. Typical cost for full roadway reconstruction (including sub‑grade repair, drainage, and resurfacing) in the Northeast ranges from $0.8 M to $1.2 M per mile, depending on terrain, material costs, and labor rates. Using a mid‑point estimate of $1 M per mile yields an approximate total contract value of $3.5 M. Adjustments for possible economies of scale, local market conditions, and the fact that the scope may include only stabilization (not full reconstruction) suggest a ball‑park range of $3 M‑$4 M. Therefore a reasonable estimate is roughly **$3,500,000**.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Illinois Tollway·Illinois

Top match · 75%

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

City of Toledo·Ohio

74% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

City of Toledo·Ohio

74% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

U.S. Department Of Transportation·Mississippi

74% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026

Illinois THA - Toll Highway Authority·Illinois

74% match

RR-25-6002 - CO #1 - ATP #4 - Systemwide Pavement Repairs

Closes 11/26/2026Opened 10/28/2026

Illinois Tollway·Illinois

74% match

I-26-2059 - Plaza Improvements

Closes 11/13/2026Opened 10/3/2026

U.S. Department Of Transportation·Idaho

74% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 9/14/2026

Illinois Tollway·Illinois

73% match

I-25-4767 - Roadway & Bridge Construction

Closes 11/20/2026Opened 10/3/2026

Massachusetts Department of Transportation·Massachusetts

73% match

610728 LEE FAP No. NHP(NHS)-003S(967)X Resurfacing and Related Work on Route 20

Closes 11/10/2026Opened 9/14/2026

U.S. Department Of Transportation·Wyoming

73% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

New Jersey Turnpike Authority (Njta)·New Jersey

73% match

Multi-Project Solicitation Order for Professional Services No. T3301 Supervision of Construction Services for Contract No. T200.748 Roadway Resurfacing Milepost 83 to 122 Section 15 (2027) And Order for Professional Services No. T4161 Supervision of Construction Services for Contract No. T200.765 Roadway Resurfacing Milepost 83 to 122 Section 18 (2027)

Closes 11/19/2026Opened 10/25/2026

Illinois Tollway·Illinois

73% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

Lexington County·South Carolina

73% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

City of Stillwater·Oklahoma

72% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026

Georgia Department of Transportation·Georgia

72% match

T32-D4-PavePRes-Coffee-SR268-193832

Closes 11/5/2026Opened 10/21/2026

California Department of General Services·California

72% match

CONTRACT NUMBER: 26-336714; SITE COMPLIANCE AND IMPROVEMENTS ¿ PATTON LANDING CALIFORNIA TAHOE CONSERVANCY CARNELIAN BAY, PLACER COUNTY, CALIFORNIA; PROJECT NUMBER: 13891

Closes 11/10/2026Opened 10/2/2026

City of Vernon·California

72% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Morgan Hill·California

72% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

Massachusetts Department of Transportation·Massachusetts

72% match

616396 DISTRICT 1 Scheduled and Emergency Drainage, Slope, and Roadway Repairs/Improvements at Var

Closes 11/17/2026Opened 10/26/2026

City of Tucson·Arizona

72% match

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

Closes 11/20/2026Opened 8/19/2026

Massachusetts Department of Transportation·Massachusetts

72% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

U.S. Department Of Transportation·North Dakota

72% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026

Texas City of San Antonio·Texas

72% match

2027 Task Order Contract for Street Rehabilitation Package 8 – Overlay

Closes 12/1/2026Opened 10/28/2026

California Department of General Services·California

72% match

CONTRACT NUMBER: 26-330888; CHPERS I: REPLACEMENT OF TOWERS AND VAULTS ¿ LEVIATHAN PEAK CALIFORNIA HIGHWAY PATROL ALPINE COUNTY, CA ; PROJECT NUMBER: 122805LL

Closes 11/17/2026Opened 8/21/2026

Kansas Turnpike Authority·Kansas

72% match

Kansas Turnpike Authority Contract No. 8289 – Ultrathin Bonded Asphalt Surface and Patching

Closes 11/10/2026Opened 10/14/2026