The contract is for the replacement of roofs on two adjacent buildings at Culmback Dam, Sultan, WA. The work includes removing the existing roofing material and replacing it with fire-resistant material. The engineer's estimate for the project is $87,000.00. The contract was awarded to Stanley Roofing.
• The project requires the removal of existing roofing material and replacement with fire-resistant material.
• The contract was awarded to Stanley Roofing.
• The engineer's estimate for the project is $87,000.00.
• The project is located at Culmback Dam, Sultan, WA.
• The contract requires the contractor to be on the District's Small Works Roster prior to bidding.
• There were two mandatory pre-bid meetings scheduled for the project.