Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Dakota guideSouth Dakota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Dakota
  4. ›Construction
  5. ›SIGNAL DRIVE AND KELLOGG PLACE STREET AND UTILITY…

Awarded contract·City of Rapid City·South Dakota

SIGNAL DRIVE AND KELLOGG PLACE STREET AND UTILITY RECONSTRUCTION

Won by RCS Construction$5.4MSingle Award
Contract source

Awarded vendors

  • RCS Construction

Description

The City of Rapid City is seeking bids for the reconstruction of 1000 LF of Signal Drive, all of Kellogg Place, and Highland Court. The project includes new asphalt and concrete pavement, curb and gutter, water main replacement, sanitary sewer main replacement, and storm sewer improvements. The engineer's estimate for the project is $5,138,000.00. The bid was awarded to RCS Construction with a base bid of $5,395,028.66. • The project is located in Rapid City, South Dakota. • The bid was posted on November 26, 2022, and the submission date was December 15, 2022. • A pre-bid conference was held on December 6, 2022. • The bid results are available as a downloadable PDF document.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
21-2670

Contract value

$5,395,029

Based on the bid results, the contract value is estimated to be around $5,395,028.66, which is the base bid submitted by RCS Construction. This estimate is supported by the engineer's estimate of $5,138,000.00. Factors that may influence the contract value include the scope of work, materials, and labor costs.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Indianapolis·Indiana

Top match · 68%

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Fargo·North Dakota

68% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Stillwater·Oklahoma

67% match

Roadway and Utility Improvements for Knoblock Street, 4th Avenue and Lincoln Street Project Number: 25TR04

Closes 11/17/2026Opened 10/17/2026

City of Cedar Rapids·Iowa

67% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

Hastings Utilities·Nebraska

66% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Missouri Department of Transportation·Missouri

66% match

KC District, City of Gladstone, Improving N. Oak Trafficway from NE 69th Street to NE 72nd.

Closes 11/3/2026Opened 9/24/2026

City of Fort Wayne·Indiana

66% match

0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St

Closes 11/12/2026Opened 10/29/2026

City of Toledo·Ohio

66% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

City of Bloomington·Indiana

66% match

3rd Street Traffic Signal Improvements S. Woodlawn Avenue & S. Hawthorne Drive

Closes 11/18/2026Opened 10/29/2026

City of Fort Wayne·Indiana

66% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

Municipality of Anchorage·Alaska

66% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Ankeny·Iowa

65% match

North Ankeny Boulevard & NW Reinhart Drive Traffic Signal and Turn Lanes

Closes 11/10/2026Opened 10/21/2026

City of Indianapolis·Indiana

65% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/31/2026

City of La Crosse·Wisconsin

65% match

Utility Installation at 19th St S - Winnebago St to Market St

Closes 11/4/2026Opened 10/20/2026

California Department of Transportation·California

65% match

Reconstruct roadway and drainage system, & construct ADA facilities.

Closes 12/9/2026Opened 10/26/2026

City of Fort Myers·Florida

65% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

City of Bakersfield·California

65% match

Traffic Signal and Lighting System at the Intersection of Calloway Drive and Etchart Road

Closes 11/19/2026Opened 10/29/2026

Oregon City of Eugene·Oregon

65% match

2026 ITB 18 Lincoln St: 5th Ave - 13th Ave (Eugene)

Closes 11/3/2026Opened 10/8/2026

NYS Monroe County·New York

65% match

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

64% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

Gwinnett County Government·Georgia

64% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Idaho Transportation Department·Idaho

64% match

Key No. 23883 2ND STREET S SAFETY IMPROVEMENTS

Closes 11/3/2026Opened 10/10/2026

Village of Cary·Illinois

64% match

Foxford Hills Lift Station No. 1 Partial Rehabilitation - Level Controls, Rails, Valves and Control Enclosure

Closes 11/9/2026Opened 10/15/2026

City of Moline·Illinois

64% match

Ave. of the Cities & 53rd St. Intersection Project

Closes 11/10/2026Opened 10/25/2026

Nevada Government·Nevada

64% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026