The contract is for the repair of the Bellefield 118th walkway, which includes the removal and disposal of surface asphalt, installation of new asphalt trail, root barrier, asphalt sealer, and drainage devices. The contract was awarded to multiple vendors, including Road Construction NW and Exo Contracting. The estimated total cost of the contract is $259,941.00. The scope of work includes trail repair or replacement, installation of root barrier, asphalt sealer, and drainage devices.
• Trail repair or replacement
• Installation of root barrier
• Installation of asphalt sealer
• Installation of drainage devices
• Geofoam installation