The Sidewalk Infill Project is a construction project that involves the placement of sidewalks in locations where there are missing segments. The project includes the installation of ADA ramps and is estimated to cost between $200,000 and $300,000. The City of Richland is the agency responsible for the project, and bids were submitted electronically through the Public Purchase website. The project is expected to be completed by the selected vendor, with the base bid and alternate bid prices ranging from $143,132 to $198,532. The project aims to improve the safety and accessibility of the sidewalks in the specified locations.
• The project includes the installation of sidewalks in multiple locations, including McMurray Street, Bradley Boulevard, Morency Drive, Gala Way, and Long Avenue.
• The project requires the installation of ADA ramps in certain locations.
• The estimated cost of the project is between $200,000 and $300,000.
• The City of Richland is the agency responsible for the project.
• Bids were submitted electronically through the Public Purchase website.
• The project aims to improve the safety and accessibility of the sidewalks in the specified locations.