The contract is for the Sky Valley Switching Station Pond Drain and Fill project, which involves furnishing labor, materials, and equipment to provide erosion control, dewater the pond, and fill the resulting hole. The engineer's estimate for the project is $285,000.00. The contract was awarded to Interwest Construction, Inc. for a subtotal of $229,229.00. Key aspects of the project include:
• Erosion control
• Dewatering the pond
• Filling the resulting hole
• Furnishing labor, materials, and equipment
• Compliance with the contract drawings and specifications