The contract is for the HVAC replacement at Robinson Middle School. The project involves removing the existing rooftop heating and cooling units and replacing them with new ones. The contract was awarded to three vendors: Piping Contractors of Kansas, Inc., SAMCO, Inc., and McElroy's, Inc. The bid opening date was March 27, 2019, at 2:00 p.m. The scope of work includes the replacement of the rooftop units, and the vendors are required to provide their bids for the project. Some key points to consider are:
• The contract is for a lump sum amount, with each vendor providing their own bid for the project.
• The vendors are required to provide their own equipment, with approved manufacturers including AAon, Daikin, Trane, and York/JCI.
• The project requires the removal and replacement of the existing rooftop units, with the new units being installed as scheduled and shown on the engineer's plans.