The contract is for the construction of a proposed hangar, concrete apron, office space, parking area, and utility improvements at the Draughon-Miller Central Texas Regional Airport. The project is referred to as Airport Corporate Hangar - Phase III. The bid submission date was August 24, 2017, at 4:30 PM EDT.
• The project involves the construction of a hangar, concrete apron, office space, parking area, and utility improvements.
• The bid submission date was August 24, 2017, at 4:30 PM EDT.
• A pre-bid conference was held on August 2, 2017, at 11:00 AM at the Draughon-Miller Central Texas Regional Airport Terminal Building.
• The contract documents, including addendums, can be downloaded from the provided links.