The County of Orange has awarded a contract to Dokken Engineering for on-call bridge design services. The contract has a maximum allowable compensation of $500,000 and is effective from December 15, 2023 to December 14, 2025. The contract includes provisions for indemnification, insurance, and notice. The County of Orange and Dokken Engineering will be working together to provide bridge design services as needed. Key aspects of the contract include:
• The contract is for on-call bridge design services
• The maximum allowable compensation is $500,000
• The contract is effective from December 15, 2023 to December 14, 2025
• The contract includes provisions for indemnification, insurance, and notice
• The County of Orange and Dokken Engineering will be working together to provide bridge design services as needed.