Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Membrane Water Treatment Plant Roof & Wall Work

Awarded contract·City of Temple·Texas

Membrane Water Treatment Plant Roof & Wall Work

Won by RM Rodriguez Construction, LP$94kSingle Award
Contract source

Awarded vendors

  • RM Rodriguez Construction, LP

Description

The contract is for repairs to the existing metal roof, gutters, and downspouts, as well as preparation and coating of the existing metal roof, and repair, cleaning, and coating of exterior masonry walls at the Membrane Water Treatment Plant. The contract was awarded to RM Rodriguez Construction, LP, with a bid amount of $93,500.00. The scope of work includes various tasks such as roof repairs, gutter and downspout replacement, and wall coating. • The contract involves repairs to the metal roof, gutters, and downspouts. • The contract includes preparation and coating of the existing metal roof. • The contract involves repair, cleaning, and coating of exterior masonry walls. • The contract was awarded to RM Rodriguez Construction, LP. • The bid amount for the contract is $93,500.00.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
236220
Solicitation №
51-06-15

Contract value

$93,500

The contract value can be estimated based on the bid amount of $93,500.00, which is the lowest bid amount among the bidders. This amount likely includes all costs associated with the scope of work, including labor, materials, and equipment. Therefore, the estimated contract value is $93,500.00.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

New York City Department of Design and Construction·New York

Top match · 72%

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 11/12/2024

City of Chicago·Illinois

71% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Neptune Beach·Florida

71% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

New York City Department of Design and Construction·New York

71% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 6/17/2016

New York City Department of Design and Construction·New York

70% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 4/24/2025

U.S. Department Of Defense·District of Columbia

70% match

N0017327Q5317- Roof Membrane Replacement and Waterproofing

Closes 11/6/2026Opened 10/27/2026

New York City Department of Design and Construction·New York

70% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 4/27/2026

City of Orange City·Florida

69% match

MAIN WATER TREATMENT PLANT GROUND STORAGE TANK PAINTING

Closes 12/3/2026Opened 10/25/2026

City of Long Prairie·Minnesota

69% match

Long Prairie, City of Water Treatment Plant Rehabilitation 25X.138024

Closes 11/18/2026Opened 10/29/2026

Northern Kentucky Water District·Kentucky

69% match

Roof Replacement for Fort Thomas Treatment Plant Chemical Building

Closes 12/4/2026Opened 10/30/2026

City of Temple Terrace, FL·Florida

69% match

Professional Engineering Services for PFAS Compliance Nanofiltration Treatment, and Concentrate Management

Closes 11/16/2026Opened 10/6/2026

U.S. Department Of Agriculture·North Carolina

68% match

Roof Repair

Closes 11/10/2026Opened 10/7/2026

The University of North Carolina·North Carolina

68% match

Roof Repairs Phase 3 – College of Veterinary Medicine Main Building

Closes 11/17/2026Opened 8/18/2026

City of Hollywood·Florida

68% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Northeast Wisconsin Technical College·Wisconsin

68% match

Aurora Roof Replacement

Closes 11/10/2026Opened 10/19/2026

Town of Jupiter·Florida

67% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of The Interior·Colorado

67% match

Z--SLV-CB PUMPING PLANT ROOF

Closes 11/2/2026Opened 10/8/2026

Massachusetts Auburn Water District Inactive·Massachusetts

67% match

Qualifications for Water Treatment Plant Construction

Closes 1/4/2027Opened 10/28/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

City of Hollywood·Florida

67% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

U.S. Department Of Energy·New Jersey

67% match

RF Roof Replacement Project

Closes 12/10/2026Opened 10/30/2026

City of Palm Springs·California

67% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/10/2026Opened 10/13/2026

City of Charlotte·North Carolina

67% match

ESF Roof Replacement

Rolling / TBD closeOpened 8/1/2026

Northeast Ohio Medical University·Ohio

66% match

Roof Replacement 26, 27, 35, and 37

Closes 11/4/2026Opened 10/7/2026

Florida Keys Aqueduct Authority·Florida

66% match

Engineering services for Kermit H. Lewin 2.0 MGD Reverse Osmosis Water Treatment Plant

Closes 12/8/2026Opened 10/28/2026