This contract concerns the complete demolition, hazardous‑material abatement, and site restoration of the former Motor Pool warehouse located at 497‑511 Railroad Avenue, Newark, NJ. The work includes asbestos, lead‑paint, PCB, and other hazardous‑waste removal, demolition of the building structure and buried railroad tracks, back‑filling with clean‑fill virgin rock, and final site grading and fencing. The specification outlines strict permitting, notification, air‑monitoring, and health‑safety requirements, as well as a milestone‑based payment schedule.
• De‑contamination of asbestos‑containing materials, lead‑based paint, and PCB‑containing equipment, with required permits and disposal certificates.
• Full structural demolition, excavation of underground utilities and railroad ballast, and back‑fill using certified virgin rock (≈ 1,100 cy).
• Comprehensive health‑safety plan, perimeter air‑monitoring (PM10 & asbestos), and detailed reporting (daily logs, waste manifests, close‑out documentation).
• Estimated project duration of 56 calendar days with a five‑stage payment structure (mobilization 10 %, hazardous‑removal 25 %, demolition 35 %, restoration 25 %, close‑out 5 %).
• Allowance up to $100 k for unforeseen site conditions, subject to Engineer approval.