The City of Edgewater is replacing its aging Lift Station #6 with a new, fully integrated lift‑station system that includes demolition, civil works, new wet‑well, pumps, electrical distribution, telemetry, and as‑built documentation. The contract is a unit‑price solicitation (ITB 20‑ES‑001) awarded to J&H Waterstop Utilities, Inc. for a total bid of $234,500. The work must be completed within 120 calendar days of the Notice to Proceed, plus a 30‑day final‑completion period, with liquidated damages of $500 per day for late finish. The project requires performance and payment bonds equal to 100 % of the contract amount, a 5 % bid bond, and compliance with numerous certifications (debarring, scrutinized‑companies, etc.). The scope spans multiple divisions (sitework, concrete, metals, equipment, mechanical, electrical) and includes telemetry integration for remote monitoring.
• Demolition of existing lift station and wet‑well, followed by installation of a precast wet‑well, submersible pumps, and control equipment.
• Electrical power distribution, motor control panels, and remote telemetry system installation.
• Required documentation: as‑built drawings, operating manuals, and various regulatory submissions.
• Single‑vendor award (J&H Waterstop Utilities, Inc.) after full open competition.