The contract is for on-call bridge design services between the County of Orange and NCM Engineering Corp. The contract has a maximum allowable compensation of $500,000 and is effective from December 15, 2023 to December 14, 2025. The contract includes provisions for indemnification, insurance, and notice. The scope of work includes bridge design services, and the contract may be renewed for an additional term. Key points include:
• The contract is for on-call bridge design services
• The maximum allowable compensation is $500,000
• The contract is effective from December 15, 2023 to December 14, 2025
• The contract includes provisions for indemnification, insurance, and notice
• The scope of work includes bridge design services
• The contract may be renewed for an additional term