Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Construction
  5. ›PERFORMED THERMOPLASTIC, As-Needed

Awarded contract·City of Spokane·Washington

PERFORMED THERMOPLASTIC, As-Needed

Won by Ennis‑Flint, Inc.$200kAwarded 9/6/2024Single Award
Contract source

Awarded vendors

  • Ennis‑Flint, Inc.

Description

This contract is a five‑year, value‑blanket agreement for the supply of pre‑formed thermoplastic road‑marking products on an as‑needed basis to the City of Spokane Street Department. A single vendor, Ennis‑Flint, Inc., was awarded the contract and must provide firm unit prices for the first year, with the option to request annual price adjustments. The scope includes a catalog of thermoplastic arrows, lane‑reduction symbols, bicycle‑lane markers, retrofit kits, and an added concrete sealer item introduced via Addendum 1. All freight costs are the vendor’s responsibility, and deliveries must occur within 30 calendar days of order receipt with a 24‑hour delivery notice. No monetary ceiling is disclosed, but first‑year estimated spend ranges from roughly $32 k to $55 k per vendor column. • Supplies a broad catalog of thermoplastic traffic‑sign products (arrows, lane‑reduction, bike‑lane, retrofit kits, etc.). • Awarded to Ennis‑Flint, Inc. under a five‑year IDIQ/value‑blanket framework; unit prices are firm for year 1. • Addendum 1 (5 Feb 2024) revised pricing pages and added a PCC concrete sealer, requiring resubmission of any bid submitted before that date.

Attached files

Key dates

Bids closed
5/6/2024
Intent to award
9/6/2024
Awarded
9/6/2024
Contract modified
5/2/2024
Starts
9/6/2024
Ends
9/6/2029
Duration
5 years

Last updated

Details

Award type
Single Award
Procurement
Indefinite Delivery / Indefinite Quantity (IDIQ)
Industry
Construction
NAICS
327990
Solicitation №
ITB 6117-24

Contract value

$200,000

The bid tab shows three vendor columns with first‑year extended totals of $32,504, $38,827, and $54,798 (including 9 % WA sales tax). Assuming the city selects the lowest‑priced vendor (the $32.5 k column) and that the five‑year blanket will see similar annual spend, the contract value would be roughly 5 × $32,500 ≈ $162,500. However, the addition of the PCC concrete sealer (not priced) and potential price adjustments over the term suggest a modest upward buffer. A realistic ballpark for the entire five‑year award is therefore between $150,000 and $250,000. Selecting a midpoint yields an estimated contract value of about $200,000.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

California Department of Transportation·California

Top match · 66%

SB/MB Option - IFPQ -Thermoplastic Polyolefin (TPO) Roofing System Installation and Repair Services

Closes 11/5/2026Opened 9/29/2026

Town of Babylon·New York

64% match

BID# 26G55 - ALKYD THERMOPLASTIC PAVEMENT MARKINGS THERMODROP OR EQUAL

Closes 11/12/2026Opened 10/30/2026

Pennsylvania Department of Transportation·Pennsylvania

63% match

SR117 Thermoform PVC Pipe Lining

Closes 11/3/2026Opened 10/15/2026

California Department of Transportation·California

62% match

Thermoplastic traffic stripe, partially grouted RSP, Rdwy Exc, & HMA.

Closes 12/8/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

62% match

TRANSDUCER,MOTIONAL

Closes 11/2/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

61% match

FABRIC,THERMAL,SPEC

Closes 11/9/2026Opened 10/8/2026

New York City Department of Design and Construction·New York

61% match

Installation of Styrene-Butadiene-Styrene (SBS) Modified Bitumen Roofing System

Rolling / TBD closeOpened 11/12/2024

U.S. Department Of Defense·United States of America

61% match

TRANSFORMER

Closes 11/6/2026Opened 9/25/2026

City of Claremont·California

61% match

On-Call Pavement Marking Services

Closes 11/2/2026Opened 10/2/2026

U.S. Department Of Defense·Pennsylvania

61% match

TUBE

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

61% match

INSERT,BODY,VALVE

Closes 11/26/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

61% match

93--PLASTIC STRIP,PRESSURE

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

61% match

ACTUATOR,MECHANICAL

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·Pennsylvania

60% match

POLYURETHANE COATING (Paints)

Closes 11/15/2026Opened 10/23/2026

New York City Department of Design and Construction·New York

60% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 4/24/2025

New York City Department of Design and Construction·New York

60% match

MECHANICAL CONSTRUCTION WORK

Rolling / TBD closeOpened 4/5/2017

U.S. Department Of Defense·United States of America

60% match

SEAT-VL URETHANE

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·California

60% match

59--SWITCH,PRESSURE-THERMO

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Energy·New Jersey

60% match

RF Roof Replacement Project

Closes 12/10/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

60% match

SHROUD SEGMENT,TURB

Closes 11/9/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

60% match

SEAT,ACCESS COVER

Closes 11/2/2026Opened 10/2/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

60% match

COMPOSITE BLOCK TIES AND DAP TIES

Closes 11/4/2026Opened 10/22/2026

City of Worcester·Massachusetts

60% match

Paving Mix (Hot Winter) / DPW

Closes 11/18/2026Opened 10/20/2026

Michigan L’Anse Creuse Public Schools Board of Education·Michigan

60% match

Roofing Replacement Bid

Closes 11/5/2026Opened 10/9/2026

California Department of Corrections and Rehabilitation·California

60% match

FPCM-HDSP-I001066-PH2-148-KR Roof Replacement for HDSP

Closes 11/5/2026Opened 9/11/2026